The free key's published terms answer it directly: it stays valid until you upgrade or the account is closed, as the free key page states, checked 2026-10-20. The day you buy a plan, the free tier ends. That single sentence decides how you should set up staging before you pay.
What ending the free key means
Before the upgrade, a common pattern is the free key for the prototype and the same free key for staging, since there is no expiry and no card. After the upgrade, both environments share the paid plan's allowance, because the free key is gone. The environment separation you had for free now costs budget.
If your prototype only ever lives on the free tier, nothing changes. The question bites the moment you pay.
The two ways to keep a staging environment
The clean way: put staging on the paid plan's headroom. The pricing page warns that a published per-second limit is not permission to run permanently at the ceiling, and the spare capacity is exactly where a second environment belongs. Poll slower in staging, share the key's budget with production, and keep the production headroom intact.
The other way: a separate free account for staging, if the account terms allow it. The published pages do not promise a second key, so verify the terms before you design around one; an assumption here is how staging dies on upgrade day.
Design for the day you pay
Write the integration so the key is one variable, and the free-to-paid transition is a configuration change, not a rewrite. The access checklist makes the same point from the other side: the free key reaches the same REST endpoints as the paid plans, so code written against it moves without changes.
When the upgrade day comes, staging either shares the paid headroom or waits for its own answer, but it never depends on a free key that just ended.
The free key is a prototype tool with an end date: yours, the day you upgrade. Plan staging for the day after, and the end date stops being a surprise.